Skip to main content
Projects & case studies

Our work

Proven results in high-hazard industries: switch between in-depth case studies and our wider project list.

All projects

Data Center Safety Data centres

Data Center Safety

Fire Safety Study, Emergency Response Plan and ESIP for a large Sydney data centre with lithium-ion battery and diesel storage.

  • Fire Safety Study (FSS)
  • Emergency Response Plan (ERP)
  • Emergency Services Information Package (ESIP)
BESS Development Renewable energy

BESS Development

Preliminary Hazard Analysis and Fire Safety Study for the first six sites of a statewide battery energy storage rollout.

  • Preliminary Hazard Analysis (PHA)
  • Fire Safety Study (FSS)
Battery Recycling Waste & recycling

Battery Recycling

DG reports, SEPP 33 screening, PHA and a Fire Safety Study for a new lithium-ion battery recycling facility in metro Sydney.

  • Dangerous Goods (DG) Reports
  • SEPP 33 Assessment
  • Preliminary Hazard Analysis (PHA)
  • Fire Safety Study (FSS)
Animal Feed Expansion Agriculture & food

Animal Feed Expansion

Dangerous Goods reports and a Preliminary Hazard Analysis for two new animal feed manufacturing sites in NSW.

  • Dangerous Goods (DG) Reports
  • Preliminary Hazard Analysis (PHA)
MHF Audit Major Hazard Facility

MHF Audit

Safety Case review and Safety Management System audit for a Major Hazard Facility chemical manufacturer in Melbourne.

  • Safety Case Review
  • Safety Management System (SMS) Audit
Battery Safety Dangerous goods

Battery Safety

Fast, affordable DG compliance and sprinkler adequacy review for a lithium-ion battery warehouse in Altona.

  • Customized Compliance Assessments
  • Affordable Solutions
  • Quick turnaround
Fire Safety Fire safety

Fire Safety

A new Fire Safety Study for an Altona Major Hazard Facility, approved on first submission after two rejected studies.

  • Comprehensive Review
  • Tailored Recommendations
  • Stakeholder Engagement
BESS Compliance Renewable energy

BESS Compliance

Risk assessments, stakeholder engagement and compliance documentation to move a 400 MW BESS project through approvals.

  • Comprehensive Risk Assessments
  • Stakeholder Engagement
  • Regulatory Compliance Documentation
Li-ion Warehouse Storage Logistics & warehousing

Li-ion Warehouse Storage

Lithium-ion battery storage risk assessment and ongoing ANZ-wide Dangerous Goods advisory for a global logistics provider.

  • Lithium-Ion Battery Fire Risk & Storage Assessment
  • Dangerous Goods (ADG Code) Compliance Review
  • Ongoing National Retained Advisory Support

The roadmap to a mature Safety Culture is “Continual Improvement”.